Clean industrial heat, cheaper than gas.

Cut the cost of your process heat by around half and its carbon emissions to near zero, using the cheapest electricity hours on the grid. Lime|loop delivers the heat up to 900°C and captures the carbon from any gas you still burn, in a single cycle.

Lime|loop chemical heat battery cutaway
Net cost of heat$45/MWhvs ~$95/MWh natural gas
Thermal profile24/7Continuous, on-demand heat
Grid footprintOf the connection a heat-only system needs
StorageDaysHeld as chemistry, not as a hot mass
The problem

Why is industry still burning gas for heat?

Gas is cheapest today and live grid electricity at peak rates is uneconomic for 24/7 process heat. A heat battery is the only path to cheap, clean continuous heat — and Lime|loop is the only one that pays for itself through a second CO₂ revenue stream.

Natural gas boiler
$95/MWh
Live grid electricity
$190/MWh
Generic heat battery
$85/MWh
Lime|loop (net)
$46/MWh
Reference case · German chemical plant

$25M/year in gas. $2.4M/year in carbon tax. Locked in.

Operating cost
Annual natural gas spend
$25M / yr
Compliance
EU ETS carbon tax
$2.4M / yr
Demand
No tolerance for downtime
24 / 7
Exposure
Volatile commodity markets
Fossil
How it works

Charge → Discharge → Capture

A closed thermochemical loop using proprietary synthetic lime (CaO ↔ CaCO₃) to store energy in chemical bonds.

01

Charge

Off-peak electricity calcines the Lime|loop sorbent — CaCO₃ becomes CaO, storing energy chemically at high density.

02

Discharge

Releases 700–900°C process heat on demand, around the clock — straight into your existing infrastructure.

03

Capture

The same cycle captures CO₂ from the gas you still burn — offset your ETS bill, or sell to an off-taker.

Unit economics

A 1.9-year payback at one German chemical plant.

Replacing 8.8 GWh/yr of gas heat. Without the CO₂ layer the payback is 3.7 years; with food-grade CO₂ sold to an off-taker at $200/t, it drops to 1.9 years.

Project payback
1.9 years
Current infrastructure
$95/MWh
  • + Carbon tax exposure (EU ETS)
  • + Volatile gas pricing
  • + Geopolitical risk
Remedium Lime|loop
$46/MWh
  • − CO₂ sales revenue
  • − Off-peak arbitrage
  • − Grid-independence buffer
Savings calculator

Calculate your plant's potential

Based on 2025 spot-electricity prices across 28 European countries. Pick your country and your annual heat demand.

Inputs · Back-of-envelope
Based on 2025 EU spot-electricity data and an industrial gas baseline of $95/MWh (incl. ETS). Excludes CO₂ off-take revenue.
Projected savings · Germany
Lime|loop heat cost
$32.1/ MWh
vs Natural gas
$95/ MWh
Current gas spend$0.84M / yr
Lime|loop spend$0.28M / yr
Annual savings
$0.55M
66% lower than gas
CO₂ avoided
1,760 t
per year
Proprietary Lime|loop synthetic lime pellets
The sorbent

Proprietary synthetic lime.
Earth-abundant, patent granted.

Lime|loop uses a reversible CaO ↔ CaCO₃ cycle on a proprietary synthetic lime engineered for durability over thousands of charge–discharge cycles. Cheap inputs, dense energy storage, high-purity CO₂ output.

Explore the product →
Pre-seed round open

Raising to deliver our pilot demonstration.

Backed by Innovate UK grants. Active commercial pipeline across chemicals, cement and food. Patented sorbent and process.